The Calculation is based on following assumptions: Poles/Phases: 2, Annual failure rate per km and pole of an Underground cable: 0.0011, Annual failure rate per km and pole of a Subsea cable: 0.00011, Repair time of an Underground cable: 20 days, Repair time of a Subsea Cable: 90 days, Decrease of downtime time: 30 %, Decrease of unplanned cable breakdowns: 70 %
Annual downtime cost
73,920,000 €
Without HiMON®
15,523,200 €
With HiMON®
Availability
90.36 %
Without HiMON®
97.97 %
With HiMON®
HiMON® helps saving significant amounts of downtime costs