Calculation of downtime cost savings

in km

in MW

in EUR

The Calculation is based on following assumptions: Poles/Phases: 2, Annual failure rate per km and pole of an Underground cable: 0.0011, Annual failure rate per km and pole of a Subsea cable: 0.00011, Repair time of an Underground cable: 20 days, Repair time of a Subsea Cable: 90 days, Decrease of downtime time: 30 %, Decrease of unplanned cable breakdowns: 70 %

Annual downtime cost

73,920,000

Without HiMON®

15,523,200

With HiMON®

Availability

90.36 %

Without HiMON®

97.97 %

With HiMON®

HiMON® helps saving significant amounts of downtime costs